RUSTICO MARASIGAN

Text Box:

 

 

 

 



 

 

Dear Sir/Ma’am:

My past experience includes Quantity Surveying, Contract Administration, Estimation, Planning, Design, Material and Project management.

Yanpet Project, Yanbu, Saudi Arabia was my latest assignment. The project was managed by Shaw, Stone and Webster of Canada. Most projects of Al Suwaidi Industrial Services Co. Ltd. are Industrial Projects that mostly construction, maintenance and shutdowns. Our Clients includes among others, Yanpet, Sadaf, Petrokemya, Hadeed, Ibn Hayyan and Aramco. To make my work easier, I use MS Project and Primavera’s Project Planner and Expedition for seamless data exchange.

With my position as Senior Quantity Surveyor / Contract Administrator and previously Senior Cost Engineer / Project Quantity Surveyor, I get to be involved in these projects since Pre-Bid Contract Reviews, Subcontract and Budget Preparation, and Project Monitoring are administered here in the Contracts Administration of the Project Management Department (PMD).

In my previous employment with Al Falak of Saudi Arabia, we have completed a two-year project into a one-year time frame. We have anticipated delays in project execution and see to it ready remedies are in placed. Request for quotation were issued earlier and negotiation were finalized ahead of schedules. These pre-planning saved us additional time aside from executing simultaneously the project in 3 regional areas. The project interconnected almost all ARAMCO sites and offices all over the kingdom. It gave ARAMCO the capability to link all it’s workstations in the kingdom.

Since we were working with ARAMCO, Al Falak gave as Additional Training on Artemis and JD Edwards – Job Cost to equip us with expected ARAMCO requirements. This is aside from my knowledge in MS Project and Primavera’s Project Planner and Expedition.

My experience with Oil and Gas Industry started at Jeddah Oil Refinery (JORC), formerly Petromin when I was at ABEG. These continued on to JG Summit Petrochemical Plant Project at Simlong, Batangas when I was with Trans-Asia (Phil.) Inc. The JG Summit project includes design and construction management of the plant that was equipped with manufacturing technology provided by Union Carbide of USA.

I will be happy to provide additional details or documents to answer any question that you might want to bring up. My land line is (+63) (2) 787 4354 and my mobile is (+63) 927 602 6700. I can also be reached in through my emails cost eng@yahoo.com and rusticom.sis@gmail.com.

 

Sincerely,

 

RUSTICO L. MARASIGAN

 

 

 

 

 

 

 

 

RESUME


 

 

 

 PERSONAL DATA :


DESIRED POSITION    : 

 

NAME    : 

Rustico L. Marasigan    (RICK)

ADDRESS : 

38 Iraq St. Better Living Subd., Parañaque City, Metro Manila, Philippines

TELEPHONE :

 

E-MAIL : 

cost_eng@yahoo.com, rusticom.sis@gmail.comrick_lm@yahoo.com,

URL :

http://ricklmarasigan.tripod.com

DATE OF BIRTH   : 

9 October 1960

EDUCATIONAL BACKGROUND :


ELEMENTARY  : 

Paco Catholic School, Paco, Manila

1967-1973

HIGH SCHOOL  : 

Paco Catholic School, Paco, Manila

1973-1977 

COLLEGE : 

Mapua Institute of Technology, Intramuros, Manila

1977-1983 
BS Civil Engineering Degree

 


EMPLOYMENT RECORD :


A)      SENIOR COST ENGINEER / QUANTITY SURVEYOR     - Al Suwaidi Industrial Services Co. Ltd. May  25, 2003 –  April 26, 2008

Contract Administrator Task:

  • Provide Review for Pre-Bid Documents and Final Contract Documents to high light  commercial risk involved with FIDIC as one of the references as well as Market Situation.
  • Analyze and develop response to Commercial Risk.
  • Provide advice on Contractual Claims.
  • Prepare Subcontract Agreement for Works, Services, Supply and Rental

 

Senior Cost Engineer/Quantity Surveyor Task:

  • Prepare project budget using JD Edwards (JDE) and P3
  • Link Primavera (P3) Activity Code with Task Code of JD Edwards
  • Update Project Cost in JDE and Primavera P3
  • Prepare Summary Report on Construction Projects and Shut down
  • Provide construction schedule and quantity take off for the projects
  • Prepare Monthly Billings for the different projects and process billings from contractors and suppliers.
  • Monitor Progress of Project and prepare update schedules on a weekly basis and coordinate with Consultants / Clients and Sub-contractors and related activities.

 

 

B)      COST ENGINEER     - Al Falak Systems Solutions and Consulting August 9, 2000 – December 13, 2002

 

    1.  Task as Cost Engineer :

  • Integrate Project Estimate, Materials, Labor & Equipment Issuance with Project Status Report. Document construction financial flow and order of activity using JD Edwards JobCost.
  • Prepare Activity Code for JD Edwards JobCost. Reflect the schedule as well as estimated cost of every activity. Counter check if expected schedule and cost correspond with actual.
  • Prepare program to bridge JD Edwards JobCost with other Construction Programs like Primavera Project Planner, Artemis, MS Project, ACT2000 and Project Data Files.
  • Prepare and recommend procedure for Material Issuance and Material Management.

  2.    Task as Project Scheduler :

  • Create Task Codes to be used in Picasso (Cost Monitoring Program) and Primavera Expedition (Cost Monitoring Program) that coincide with WBS codes for Primavera Project Planner (P3)
  • Create, assign and update Target Schedules. Record progress using Activity form and Bar chart Compare actual project status to forecasted accomplishment and identify problem areas.
  • See to it that Idle Time is minimized and resources utilized effectively

·         Prepare periodic report to show how resources and manhours are utilized especially rental equipment. Rental or subcontracted works should be within the bounds of schedule and budget.

C)      COST ENGINEER     - Mondragon Leisure and Resort Corp. May 5, 1997- July 31, 2000

  • Review and evaluation billings of contractors
  • Member of the Technical Committee that reviews offers and quotation from suppliers. Prepare Purchase Order if Committee finds offer advantageous.
  • Coordinate with Chief Engineer and Project Director regarding billings from contractors or suppliers without Purchase Order.
  • Assign appropriate Cost Code for each Purchase Order to reflect the project and task.
  • Provide recommendations to Project Director and Finance on billings submitted by contractors for payments.
  • Prepare Project Monthly Accomplishment Report to the company President and Project Director.
  • Develop and continually upgrade the following programs using MS Access Program

a.       Purchased Materials Monitoring Program

b.       Materials Issuance Monitoring Program

c.       Relocated Materials Monitoring Program

d.       Materials Inventory Program

e.       Maintenance Monitoring Program

f.         Cost Monitoring Program

g.       Estimate and Physical Accomplishment Program

D)      DESIGN STAFF     - Trans-Asia (Philippines) Inc. May 1, 1995 - April 30, 1997 Part of the group that designed the Civil and Structural works of the following projects :

a)        Intel Plant, Cavite Industrial Zone

b)       Kajima Plant, Laguna Industrial Site

c)       Golden Peninsula (Resort Complex), Batangas City

d)       AMARI Coastal Highway & Flyover Complex, Cavite Coastal Hway

e)       Crown & Grande Towers, 38 & 43 Story High Rise for Ortigas

f)    JG Summit Petrochemical Corporation – Simlong, Batangas

E)      STRUCTURAL EDITOR     - Vista CAD Services September 1, 1994 - April 30, 1995

Supervise the conversion of Hard Copy Files of plans into Soft Data Files for ACAD format to conform to ACI code and Engineering Format.

F)      COST ENGINEER     - ABEG Arabia Limited, January 6, 1991 - July 10, 1994

Involved in the following projects :

a.       Raniah Project - Military air base, Raniah, Taif, Saudi Arabia

b.       Jeddah Oil Refinery Company - Oil refinery, Jeddah, Saudi Arabia

c.       Mamoud Saeed Glass Industry - Glass Company, Jeddah, Saudi Arabia

d.       Al Salama Hospital - Hospital Complex, Jeddah, Saudi Arabia

e.       Saudi Arabian Precious Metals - Gold Mine Site, Sukhaybarat, Buraydah,SA

f.         Saudi Arabian Ductile Iron & Pipes Company - Metal Company, Dammam,SA

G)     SITE ENGINEER     - Mahmoud Othman Estb., February 4, 1987 - June 30, 1990

Manage the job execution, prepare bid proposal and coordinate client requirement with scope of work. Among the projects are private villas in Riyadh and Riyadh Al Kharj   Hospital (RKH).

H)      TECHNICAL ASSISTANT     - BenguetCorp Foundation Inc, Mar. 16 ‘85 -Dec 30, 1986

Design, draft and estimate project proposal to Benguet Corporation (BC). Develop skills upgrading program for BC production staff. Undertake, supervise and monitor training.


I)                  
SOFTWARE EXPOSURE :


JD Edwards ERP

Primavera (P3), Expedition

AutoCAD

MS Projects 

Primavera Enterprise

Microsoft C 

AutoCAD MAP 

 Visual Basic

SAP 

MS Access, MS Excel

Land Dev 

AutoStaad

Timberline 

MicroStation

AutoCivil

STAAD III

               
REFERENCES  :

Omar Niaz
Senior Accountant, Al Suwaidi Ind. Services
PO Box 991, Jubail 31951, Saudi Arabia
Tel. : + 966 (3) 341-59-39 

 

 
Jose Lubis Jr.
Senior Civil Estimator, Al Suwaidi Ind. Services
PO Box 991, Jubail 31951, Saudi Arabia
Tel. : + 966 (3) 341-59-57

Text Box:  Engr. August Cantor
General Manager, Thaison Contractors
Tahanan Village, Sucat, Paraqaque City
Tel. : + 63 (2) 842-22-23

CERTIFICATES  :

   

JOB CERTIFICATES:

 

 

 

 

 

RUSTICO L. MARASIGAN